Purpose: Pre-feasibility study
Fuel: Fly Ash
Project type: Greenfields
IES was requested by AEL to perform a “fast tracked” pre-feasibility study into replacing their existing Fly Ash boiler as their primary Process steam generator. In order to develop scenarios, fuel sources, steam raising technology, location, steam requirements, power requirements and materials handling logistics were considered. The study yielded positive results with the option of a CHP plant, it’s benefits (financial and technical), and high level technical aspects being specified.