AEL – Combined Heat and Power Station pre-feasibility study 

Purpose: Pre-feasibility study
Fuel: Fly Ash
Project type: Greenfields

IES was requested by AEL to perform a “fast tracked” pre-feasibility study into replacing their existing Fly Ash boiler as their primary Process steam generator. In order to develop scenarios, fuel sources, steam raising technology, location, steam requirements, power requirements and materials handling logistics were considered. The study yielded positive results with the option of a CHP plant, it’s benefits (financial and technical), and high level technical aspects being specified.