KC Energy – 2 off Fly Ash boiler and 1 off Extraction Exhuast Turbo Generator (EETG) electrical design and support

Client: KC Energy
Purpose: Provide electrical engineering design, installation and commissioning support
Pressure: 67 barg
Temperature: 480 oC
Flowrate: 2 X 30 T/hr
Fuel: Duff coal
Project type: Brownfields

IES provided substantial electrical engineering services into the KC ENERGY, Combined Heat and Power (CHP) installation on the KARBOCHEM site. All the Balance of Plant (BOP), electrical engineering design, drafting, specification, installation oversight and commissioning of the plant was completed. Electrical and to a certain extent, Control system interfacing with the existing KARBOCHEM grid; package suppliers and existing equipment was successfully performed.